One of the UK’s leading independent specialist Mechanical Engineering businesses

With over 30 years’ experience in the UK’s Power and Industrial sectors, we have the experience and expertise to deliver both practical and innovative engineering solutions.

Slough Heat & Power

Outline Scope

• Provide a rapid response team for any repair works.
• Repairs to Boiler 17 Superheater.
• Repairs to Boiler 17 Economiser.
• Hydrostatic pressure testing.

Download case study (PDF)

Key Facts

  • Client Name: SSE

  • Site Location: Slough

  • Start Date: March 2022

Glasgow Recycling and Renewable Energy Centre

Outline Scope

• Super Heater Bundle Removal &
• Replacement
• Economiser & Smoke Tube Boiler
Over-haul & Inspections
• Additional works – hot ball Scroll shaft repair (Build-up of weld metal), Furnace Scrapper bar replacement & transfer screw pipework repair & replacement

Download case study (PDF)

Key Facts

  • Client Name: Viridor

  • Site Location: Glasgow

  • Start Date: April 2021

Slough Heat & Power

Outline Scope

  • Boiler 17 Outage & Inspection Works
Download case study (PDF)

Key Facts

  • Client Name: SSE

  • Site Location: Slough

  • Start Date: June 2021

Hoddesdon Energy

Outline Scope

• Remove 16 soot blower and replace with new steel work.
• SPG’S on 2 Streams (8 per stream).

Download case study (PDF)

Key Facts

  • Client Name: BOUYGUES

  • Site Location: Hoddesdon

  • Start Date: June 2021

Runcorn EfW

Outline Scope

  • Replacement of 1,592 superheater tubes on Line 1 & 2
  • Flow reversal pipework reroute
  • Common valve replacements
  • Mechanical maintenance work
  • NDT testing
  • Grit Blasting
Download case study (PDF)

Key Facts

  • Client Name: Viridor

  • Site Location: Runcorn

  • Start Date: May 2021

Glasgow Recycling & Renewable Energy Centre

Outline Scope

  • Survey Pipework System
  • Coded Welding
  • Fabrication and installation of Pipework & Supports
  • Compile all QA Documentation for NoBo ‘sign off’
  • Compile all supporting Test Packs
  • Conduct all Pressure Testing
Download case study (PDF)

Key Facts

  • Client Name: Viridor

  • Site Location: Glasgow

  • Start Date: January 2017

Fiddlers Ferry

Outline Scope

  • Principal Contractor for the statutory outage and associated works
  • General maintenance; on site 365 days a year
  • CMV Replacement on all 4 units
  • Installation of SO3, OFA
  • Biomass co-firing
Download case study (PDF)

Key Facts

  • Client Name: Scottish & Southern Energy

  • Site Location: Cheshire

  • Start Date: 2001 to 2021

Blackburn Meadows

Outline Scope

  • Installation of all Structural Steelwork
  • Pressure Parts (up to the Turbine TP)
  • Balance of Plant
Download case study (PDF)

Key Facts

  • Client Name: Andritz

  • Site Location: Sheffield, UK

  • Start Date: 2004/2015

Cameronbridge

Outline Scope

  • Combustion grate
  • Water tube fluidised bed biomass boiler (BFB)
  • Piping and attachments
  • Balance of boiler house Mechanical plant systems
  • Combustion air fans and ducting
  • Refractory Installations and works
  • Fabrication
  • Mechanical Installations
  • Testing and Commissioning
Download case study (PDF)

Key Facts

  • Client Name: Dalkia Utilities

  • Site Location: Fife, Scotland

  • Start Date: January - July 2011